Bright reading corner with a closed white-trimmed window, oak chair and muted blue throw in a renovated Spanish-style home.

Which Loma Portal Houses the Airport Has Already Quieted, and Which Are Still Waiting

Buyers comparing Loma Portal with La Playa, Sunset Cliffs or the Wooded Area usually start with price, then think about the planes. In Loma Portal those two questions meet at each house. San Diego International Airport runs a sound insulation program that has finished 6,238 homes as of September 2026, and Loma Portal is one of the neighborhoods where homes are eligible. Some eligible houses have already been retrofitted with federally funded sound insulation. Others are still on the waitlist. Which of those a house is shows up in its paperwork, not in the ZIP code median.

The Point Loma median covers the whole ZIP code

The Greater San Diego Association of REALTORS® October 2026 update reports figures for ZIP 92106, which it labels "Point Loma." Loma Portal is not broken out separately. In October 2026, detached homes in 92106 sold at a median of $1,855,000 after 75 days on market and brought in 92.5% of their original list price. Only 8 homes closed that month.

With eight sales, October is a thin month. Year to date through October 2026, 114 detached homes closed in 92106 at a median of $1,872,500, down 3.7% from the same stretch of 2025. Those homes averaged 31 days on market and brought in 97.5% of original list price. The rolling 12-month single-family median is $2,250,000. SDAR notes that its percentages don't account for seller concessions and that small samples can make changes look extreme.

For comparison, ZIP 92107, which SDAR labels Ocean Beach, had a detached median of $2,237,000 in October 2026, with homes selling in 27 days. The market has been steady this year and slow this fall. In a slow fall market, buyers have time to find out what a particular house has already had done.

What a treated house has already had done

The Quieter Home Program has operated since 2001. A home qualifies if it sits inside the airport's 65 dB CNEL contour and its average indoor noise level is at least 45 dB with the windows closed. The FAA's goal is to lower indoor noise by at least 5 dB. The airport describes a 5 dB reduction as quite a noticeable difference. Treatments cost the homeowner nothing.

The work is different from house to house. According to SAN's September 2026 release, treated homes may get noise-reducing exterior doors and windows, ventilation such as air conditioning, and weather stripping and caulking around openings. Which treatments a home gets varies. Two treated houses on the same street could have had very different work done.

The program doesn't maintain the products it installs. Each product has a manufacturer warranty, and the homeowner gets a warranty package when the work is finished. If you're looking at a treated house, that warranty package shows which products were installed and who made them. Participating homeowners also grant the Airport Authority an avigation easement, which the program's FAQ lists.

What an untreated eligible house is still waiting for

A house inside the boundary that hasn't been treated is in a very different position. At the airport's February 2026 noise advisory committee meeting, staff said more than 1,200 homes were on the waitlist and that waits can run longer than a year. They also said the number of homes still to be treated keeps changing. According to the program's FAQ, the whole process can take several years. Once a home joins a construction group, it takes about 2 to 3 years to finish every step, and construction on the house itself takes about 15 to 30 business days.

Funding comes in yearly grants. The FAA gave the program $15 million in August 2025 for 250 homes and listed Loma Portal among the eligible communities. The airport announced a $15.3 million award on September 1, 2026, to treat about 400 more homes. Potentially historic homes waited several years for an agreement on how the airport could treat them. By November 2025 that agreement was signed and the first group of historic homes had started. In February 2026, airport staff said historic homes could go forward with treatment again.

The boundary itself can change. The current program maps carry an April 2026 date, and the airport expects to reevaluate its noise exposure map in 2027. Airport staff said that five-year map review is also when they review how the waitlist works. If you buy an untreated house near the edge of the boundary, you're buying it with an open question about where that edge will be after 2027.

The flight path in 2026

Airport data from 2023 to 2025 shows two trends at once. Noise complaints dropped from about 54,300 in 2023 to about 12,300 in 2025, and the number of households filing complaints fell 29%. Over the same years, early turns rose from 0.6% of departures to 1.4%. An early turn is when a departing plane turns outside the departure corridor set by the FAA's "Noise Dots." In the Point Loma area, those turns rose 161% from 2023 to 2025.

Overnight flights changed early this year. An updated departure procedure called CLSSY III took effect in late January 2026 for eastbound departures between 10 p.m. and 6:29 a.m. Its purpose is to reduce unintended flights over northern Mission Beach and all of Point Loma. Comparing February 2024 with February 2026, the airport reported fewer unintended flights over Ocean Beach and Mission Beach and a more consistent departure path. SAN's curfew runs from 11:30 p.m. to 6:30 a.m. There were 178 curfew violations in 2025, and $1.592 million in fines was assessed that year. From January through April 2026 there were 41 violations, compared with 51 in the same months of 2025.

The airport is also growing. The new Terminal 1 opened on September 23, 2025, with 19 gates and is planned to reach 30 gates by early 2028. The San Diego Union-Tribune reported that SAN handled a record 25.32 million passengers in 2025 and added more than a dozen new or resumed nonstop routes. In February 2026, airport staff said SAN had about 230,000 total operations, meaning takeoffs and landings, in 2025, and that 2026 was on pace for about 235,000. With traffic still rising, a house's own insulation matters more than it did a few years ago.

If you own on these streets and plan to sell

Sellers need to decide about windows before they list. The program does not reimburse owners for similar work they paid for themselves before the program treated their home. If your eligible house is still untreated, replacing the windows and doors yourself before listing means paying for work the program might have covered. If your house is already treated, the warranty package lists what was installed, so buyers can see it. Either way, it makes sense to look at the rest of the house before deciding on any pre-sale renovation. We've covered that broader decision in our post on whether to renovate or sell as-is in Point Loma.

Questions buyers ask about Loma Portal and the program

How do I tell whether a house is inside the program boundary? The airport posts its current boundary maps on the Quieter Home Program page, split into East 1, East 2 and West areas.

If an owner turned the program down years ago, is the house still eligible? According to the airport, a house that stays inside the boundary stays eligible, but the owner has to submit a new application and the house goes back on the waitlist.

Do the Point Loma market numbers include Loma Portal? Loma Portal sales are part of the ZIP 92106 figures, along with the rest of that ZIP code. SDAR does not publish a separate Loma Portal figure.

If you're preparing a Loma Portal home for sale and aren't sure whether it has been treated, is on the waitlist, or would benefit from work before listing, bring that question to Renovation Realty. We fund and manage pre-sale renovations through our own construction team and defer the cost until closing, so the window decision fits into one plan for the whole house. Book a Free Home Evaluation to get started.

Work With Us

Renovation Realty is not only an innovator, but we passionately strive to provide world-class service.
Follow Us